DIMS Engineering Suite Life Cycle Cost (LCCA) & Carbon Evaluator

Life Cycle Cost (LCCA) & Carbon Comparison Tool

20-Year CapEx, OpEx, Dual-Chiller Plant, Structural Height Savings & Net Lettable Space Evaluation

2-Chiller & 2-Piping Model Floor-to-Floor & Space Value COâ‚‚ Emissions Tracking
Reference Project Archetypes (Select to Load Benchmark) All costs, chiller configurations, and space parameters can be customized below

1. 1,000 m² Commercial Office

Active

Standard commercial office floor plate operating 10 hrs/day (2,600 EFLH/yr). Compares VAV against Radiant Ceiling + DOAS.

1,000 m² GFA 2,600 EFLH/yr ~35% Energy Saved

2. 300-Room Luxury Hotel

Active

24/7 hospitality operation (18,000 m² GFA, 4,500 EFLH/yr) with dedicated high-temp chiller plant and silent guestroom cooling.

18,000 m² GFA 24/7 Operation Fast Payback (< 2.5 Yrs)

3. 5,000 m² New-Build Tower Floorplate

Active

New-build development capturing slab-to-slab height savings (300 mm/floor) and +1.8% additional Net Lettable Area from smaller shafts.

5,000 m² GFA New-Build Credits Lower Net CapEx + Extra NLA
Net NPV Lifecycle Savings
$248,500
Over 20-Year Horizon
Net CapEx Delta
+$14,000
After New-Build Credits
Annual Energy & OpEx Saved
$16,800/yr
-38% HVAC kWh Reduction
Simple Payback
0.8 Yrs
Immediate if Net CapEx ≤ 0
Lifecycle COâ‚‚ Reduction
512 tCOâ‚‚e
25.6 tCOâ‚‚e Saved / Year
Extra Lettable Space
+18 m²
Smaller Riser Shafts
1. Project, Plant & Space Parameters
2. Chiller & Piping Architecture
Models 1 High-Temp Chiller (16°C for Radiant) + 1 Low-Temp Chiller (6°C for DOAS) and 2 separate CHW piping networks.
3. New-Build Height & Space Savings
~300mm lower floor-to-floor facade/structure saving
From 70% smaller vertical air shafts
Adjust any unit rate ($/m²) below. Dedicated Chiller mode explicitly prices 2 chiller setups and 2 piping systems.
HVAC & Building Subsystem VAV ($/m²) Radiant ($/m²) VAV Total Radiant Total
1a. Low-Temp Chiller Plant (6°C CHWS)
VAV: 100% capacity | Radiant: DOAS dehumidification chiller
$68,000 $32,000
1b. Dedicated High-Temp Chiller Plant (16°C CHWS)
2nd Chiller Setup dedicated to sensible radiant cooling
$0 $48,000
2a. Primary Low-Temp CHW Piping & Pumps
Chilled water risers & distribution to AHU/DOAS coils
$34,000 $18,000
2b. Secondary High-Temp Radiant Piping, Pumps & Manifolds
2nd Piping Network + PEX loops & zone mixing manifolds
$0 $36,000
3. Air Handling Units (VAV AHUs vs Compact DOAS)
DOAS air volume is 65–70% smaller than VAV
$52,000 $28,000
4. Sheet-Metal Ductwork, VAV Boxes & Diffusers
Downsized ventilation ductwork vs full-sized VAV ducts
$74,000 $26,000
5. Radiant Ceiling Panels / Embedded Hydronic Slabs
Sensible radiant terminal surfaces
$0 $72,000
6. BMS Controls, Dew-Point Sensors & Commissioning $24,000 $28,000
Subtotal Mechanical HVAC CapEx $252/m² $288/m² $252,000 $288,000
7. New-Build Floor-to-Floor Height Saving Credit
~300 mm slab-to-slab reduction per floor (curtain wall & structure savings)
$0/m² -$22/m² $0 -$22,000
Net Construction CapEx (After Structural Height Credit) $252/m² $266/m² $252,000 $266,000
Engineering Cost Model Summary: Even with 2 chiller setups and 2 chilled water piping networks in Dedicated Chiller mode, New-Build floor-to-floor height reduction and 36% lower annual kWh deliver rapid payback and substantial COâ‚‚ reduction.

Ready to Evaluate Your Building or Floorplate?

Explore the full DIMS Hydronic Design Suite or request a project-specific thermal and lifecycle cost study.

Explore Hydronic Design Suite →